Prefractionator Tower: 1D-101 Replacement

TMF fabricated a replacement for Tower 1D-101, addressing critical corrosion issues with upgraded materials and precision welding for extended service life.

Client

Phillips 66

Location

Rodeo, CA

Year

Apr. 2014 – Feb. 2015

Overview

When Phillips 66 planned to replace its aging Unicracker Prefractionator Tower 1D-101, the company turned to Thompson Metal Fab for the fabrication of the new vessel. Originally built with substandard corrosion resistance, the tower had experienced internal pitting and temporary repairs since 2009. TMF fabricated a replacement vessel 126 feet long, with diameters ranging from 10 feet 6 inches to 17 feet, using clad plate (carbon steel exterior and 317 stainless interior) and weld overlays at all joint zones. The tower was manufactured in three sections and assembled in-house. For final acceptance, the vessel underwent a hydrostatic leak test with 120,000 gallons of water. Once complete, the 200-ton vessel was rolled out of TMF’s shop and directly onto a barge via the facility’s riverfront launch area. The project illustrates TMF’s capability in pressure vessel fabrication and delivery of critical refinery components.

Length 126ft
Final Weight 200 tons
Water Test 1m lbs

Project Highlights

TMF fabricated and hydrotested a replacement tower to address corrosion issues.

  • Performed full-scale leak test with over 100,000 gallons of water
  • Verified weld integrity under pressure
  • Captured and disposed of test water per spec
  • Rolled completed vessel directly to adjacent barge slip